Tank Bridge Project in Brazil, Indiana

Posted by & filed under Crawler Cranes.

From November 4th – 7th our Louisville branch of Sterett Crane & Rigging worked for Cumberland Mine at Chinook Mine in Brazil, IN (30 MILES FROM INDIANAPOLIS) to take down an existing bridge over tank. Projects that aim to keep existing structures while separating dysfunctional pieces can be tricky, but with proper planning and execution… Read more »

Multiple Phase Project in Downtown Owensboro, KY

Posted by & filed under Crawler Cranes.

Sterett Crane & Rigging recently joined a project in downtown Owensboro, Kentucky. We are assisting in a stripping / renovation project. A new business will be going in the existing structure after it is completely demolished. We are doing several different phases of work here, including demolition, stripping, reconstruction, and planning. The current phase we… Read more »

4 Roses Distillery Job in Lawrenceburg, KY

Posted by & filed under Crawler Cranes.

We were delighted to head out to Lawrenceburg, KY last month to work at the 4 Roses Distillery. 4 Roses called us to assist in some heavy lifting at their distillery headquarters and they knew it would we a tough job because of the condensed space. We departed from our Louisville location with a plan… Read more »

Bridge Construction in Bardstown, Kentucky

Posted by & filed under Crawler Cranes.

With Bardstown, Kentucky being just a short drive from Sterett Crane & Rigging’s Louisville, Kentucky branch; we were happy to help out with the construction of a bridge. We headed out to Nelson County, Kentucky with our Liebherr LTM1500 and LTM1400 to assist in this growing project. The image below shows our two cranes lifting… Read more »